$7 flat-rate shipping on $49, Ships FREE over $49.

{ "id":11884994575, "title":"Complete 30a BIAB Kit", "handle":"complete-30a-biab-kit", "description":"\u003cp\u003eLet us help you get started on you endeavor to build an electric brewery. As we build these as well, we have all the parts you need to build your brewery in one location. Give us a few days to assemble and package all the parts you need to build your own BIAB brewery.\u003c\/p\u003e\n\u003cp\u003eSave yourself time and effort, while also reducing the tools needed to build your brewery.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eUsual lead time is 1-2 days, as each package is made to order\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eLet us help you get started.\u003c\/p\u003e\n\u003ch1\u003eThe kit includes:\u003c\/h1\u003e\n\u003ch2\u003eBasic Kit Hardware\u003c\/h2\u003e\n\u003cul type=\"disc\"\u003e\n\u003cli\u003e4 - LEDs (1 white 220v, 1 blue 110v, 1 red 110v, and 1 green 220v)\u003c\/li\u003e\n\u003cli\u003e1 - Emergency Stop locking push button with NC Contact\u003c\/li\u003e\n\u003cli\u003e1 - 2-Way Switches with NO Contact for pump (off-on)\u003c\/li\u003e\n\u003cli\u003e1 - 2-Way Yellow\/Orange LED Toggle switch for element contactor (off-on)\u003c\/li\u003e\n\u003cli\u003e1 - Additional NO Contacts for back of 3 way switches\u003c\/li\u003e\n\u003cli\u003e1 - Key toggle Switch for panel on\/off\u003c\/li\u003e\n\u003cli\u003e2 - 63a DIN Contactors w\/ 110v Coils for main power \u0026amp; element control\u003c\/li\u003e\n\u003cli\u003e1 - 40a Solid State Relays for control of element\u003c\/li\u003e\n\u003cli\u003e1 – Small external pre-drilled and tapped heat sink for element SSR\u003c\/li\u003e\n\u003cli\u003e1 - 1\/2m cut of DIN rail or pre-installed piece in pre-cut enclosures\u003c\/li\u003e\n\u003cli\u003eTerminal Blocks for wire from 6-24 awg\u003c\/li\u003e\n\u003cli\u003e6a 1 pole DIN Rail Breaker\u003c\/li\u003e\n\u003cli\u003eTerminal block anchoring ends\u003c\/li\u003e\n\u003cli\u003eTerminal block end covers\u003c\/li\u003e\n\u003cli\u003eTerminal block connecting jumpers\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2\u003eEnclosure and outlets\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e1 – Enclosure either pre-cut and drilled or not\u003c\/li\u003e\n\u003cli\u003e1 – L6-30 Flanged outlets for elements\u003c\/li\u003e\n\u003cli\u003e1 – L5-15 Flanged outlets for pumps\u003c\/li\u003e\n\u003cli\u003e1 – L14-30 flanged inlet for main power supply\u003c\/li\u003e\n\u003cli\u003e1 – L5-15 plugs for pumps\u003c\/li\u003e\n\u003cli\u003e1 –L14-30C Connector for main power supply\u003c\/li\u003e\n\u003cli\u003e1 – XLR Male connectors for temperature input\u003c\/li\u003e\n\u003cli\u003eTags for panel include:\n\u003cul\u003e\n\u003cli\u003ePower \/ Off-On\u003c\/li\u003e\n\u003cli\u003eStop\u003c\/li\u003e\n\u003cli\u003eElement \/ Off-On\u003c\/li\u003e\n\u003cli\u003eElement\u003c\/li\u003e\n\u003cli\u003ePump \/ Off-On\u003c\/li\u003e\n\u003cli\u003ePump\u003c\/li\u003e\n\u003cli\u003eTemp Probe\u003c\/li\u003e\n\u003cli\u003e240v \/ 30a\u003c\/li\u003e\n\u003cli\u003e120v \/ 6a\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2\u003eTemperature Controller and probes\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003eElectric Brewing Supply EBS101 PID Controller\u003c\/li\u003e\n\u003cli\u003e1 - 1\/2\" MPT to 1-1\/2\" long Temperature Probe\u003c\/li\u003e\n\u003cli\u003e1 - 1\/2\" NPT Locknuts\u003c\/li\u003e\n\u003cli\u003e1 - 1\/2\" NPT washer and o-rings\u003c\/li\u003e\n\u003cli\u003e1 – XLR Female connectors for temperature probes\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2\u003eWiring and wire fittings\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003eRange style main power cable\u003c\/li\u003e\n\u003cli\u003eBllack 10 gauge wire\u003c\/li\u003e\n\u003cli\u003eRed 10 gauge wire\u003c\/li\u003e\n\u003cli\u003eGreen 10 gauge wire\u003c\/li\u003e\n\u003cli\u003eBlack 14 gauge wire\u003c\/li\u003e\n\u003cli\u003eRed 14 gauge wire\u003c\/li\u003e\n\u003cli\u003eWhite 14 gauge wire\u003c\/li\u003e\n\u003cli\u003eYellow 14 gauge wire\u003c\/li\u003e\n\u003cli\u003eBlue 14 gauge wire\u003c\/li\u003e\n\u003cli\u003eRed 18 gauge wire\u003c\/li\u003e\n\u003cli\u003eYellow 18 gauge wire\u003c\/li\u003e\n\u003cli\u003eWhite 18 gauge wire\u003c\/li\u003e\n\u003cli\u003e#10 Yellow Spade connectors for 10ga wire connections on SSR relays\u003c\/li\u003e\n\u003cli\u003e#6 Blue Spade Connectors for most 110v wiring throughout the panel\u003c\/li\u003e\n\u003cli\u003e#6 Red spade connectors for the low voltage and temp probe wiring\u003c\/li\u003e\n\u003cli\u003e#10 Blue ring connectors for grounding wire on enclosure posts\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003ch2\u003e Enclosure Information\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003ePre-cut Stainless enclosure is the equivalent of an enclosure straight from our cut stack for the assembled panels, these are cut, cleaned, drilled and tapped.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eAll kits include a printed copy of our wiring guide book.\u003c\/h3\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003ch1\u003eTools you will need include:\u003c\/h1\u003e\n\u003cul\u003e\n\u003cli\u003eWire Cutters\u003c\/li\u003e\n\u003cli\u003eWire strippers\u003c\/li\u003e\n\u003cli\u003eCrimping tools for spade and ring connectors\u003c\/li\u003e\n\u003cli\u003ePhillips screw driver(s)\u003c\/li\u003e\n\u003cli\u003eFlat head screw driver(s)\u003c\/li\u003e\n\u003cli\u003eZip ties and zip tie bases (optional)\u003c\/li\u003e\n\u003cli\u003eLabeler or other means to tag wires\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003ch3\u003e\u003c\/h3\u003e", "published_at":"2017-08-21T20:18:17-04:00", "created_at":"2017-08-21T20:18:17-04:00", "vendor":"Electric Brewing Supply", "type":"DIY Kits,Parts \u0026 More", "tags":["Complete DIY Kits","PID Controlled Kits"], "price":37500, "price_min":37500, "price_max":38500, "available":true, "price_varies":true, "compare_at_price":null, "compare_at_price_min":0, "compare_at_price_max":0, "compare_at_price_varies":false, "variants":[{"id":48557187215, "title":"Pre-cut Stainless (Add $50) \/ NPT Probe", "option1":"Pre-cut Stainless (Add $50)", "option2":"NPT Probe", "option3":null, "sku":"ckbiab-config-c", "requires_shipping":true, "taxable":true, "featured_image":{"src":"\/\/cdn.shopify.com\/s\/files\/1\/1000\/8196\/products\/52998cb9afa699ffcf02ee9a0ceba53a_56137caa-c645-4411-97dc-27fc23e82869.jpg?v=1524581932", "id":29595564943}, "available":true, "options":["Pre-cut Stainless (Add $50)","NPT Probe"], "price":37500, "weight":9979, "compare_at_price":null, "inventory_quantity":-16, "inventory_management":null, "inventory_policy":"deny", "barcode":""},{"id":48557187279, "title":"Pre-cut Stainless (Add $50) \/ 1.5 Tri-Clamp Probe (add $10)", "option1":"Pre-cut Stainless (Add $50)", "option2":"1.5 Tri-Clamp Probe (add $10)", "option3":null, "sku":"ckbiab-config-d", "requires_shipping":true, "taxable":true, "featured_image":{"src":"\/\/cdn.shopify.com\/s\/files\/1\/1000\/8196\/products\/52998cb9afa699ffcf02ee9a0ceba53a_56137caa-c645-4411-97dc-27fc23e82869.jpg?v=1524581932", "id":29595564943}, "available":true, "options":["Pre-cut Stainless (Add $50)","1.5 Tri-Clamp Probe (add $10)"], "price":38500, "weight":9979, "compare_at_price":null, "inventory_quantity":-5, "inventory_management":null, "inventory_policy":"deny", "barcode":""}], "images":["\/\/cdn.shopify.com\/s\/files\/1\/1000\/8196\/products\/PID_biab.jpg?v=1524581932","\/\/cdn.shopify.com\/s\/files\/1\/1000\/8196\/products\/52998cb9afa699ffcf02ee9a0ceba53a_56137caa-c645-4411-97dc-27fc23e82869.jpg?v=1524581932"], "featured_image":"\/\/cdn.shopify.com\/s\/files\/1\/1000\/8196\/products\/PID_biab.jpg?v=1524581932", "options":["Size","Boil Probe"], "content":"\u003cp\u003eLet us help you get started on you endeavor to build an electric brewery. As we build these as well, we have all the parts you need to build your brewery in one location. Give us a few days to assemble and package all the parts you need to build your own BIAB brewery.\u003c\/p\u003e\n\u003cp\u003eSave yourself time and effort, while also reducing the tools needed to build your brewery.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eUsual lead time is 1-2 days, as each package is made to order\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eLet us help you get started.\u003c\/p\u003e\n\u003ch1\u003eThe kit includes:\u003c\/h1\u003e\n\u003ch2\u003eBasic Kit Hardware\u003c\/h2\u003e\n\u003cul type=\"disc\"\u003e\n\u003cli\u003e4 - LEDs (1 white 220v, 1 blue 110v, 1 red 110v, and 1 green 220v)\u003c\/li\u003e\n\u003cli\u003e1 - Emergency Stop locking push button with NC Contact\u003c\/li\u003e\n\u003cli\u003e1 - 2-Way Switches with NO Contact for pump (off-on)\u003c\/li\u003e\n\u003cli\u003e1 - 2-Way Yellow\/Orange LED Toggle switch for element contactor (off-on)\u003c\/li\u003e\n\u003cli\u003e1 - Additional NO Contacts for back of 3 way switches\u003c\/li\u003e\n\u003cli\u003e1 - Key toggle Switch for panel on\/off\u003c\/li\u003e\n\u003cli\u003e2 - 63a DIN Contactors w\/ 110v Coils for main power \u0026amp; element control\u003c\/li\u003e\n\u003cli\u003e1 - 40a Solid State Relays for control of element\u003c\/li\u003e\n\u003cli\u003e1 – Small external pre-drilled and tapped heat sink for element SSR\u003c\/li\u003e\n\u003cli\u003e1 - 1\/2m cut of DIN rail or pre-installed piece in pre-cut enclosures\u003c\/li\u003e\n\u003cli\u003eTerminal Blocks for wire from 6-24 awg\u003c\/li\u003e\n\u003cli\u003e6a 1 pole DIN Rail Breaker\u003c\/li\u003e\n\u003cli\u003eTerminal block anchoring ends\u003c\/li\u003e\n\u003cli\u003eTerminal block end covers\u003c\/li\u003e\n\u003cli\u003eTerminal block connecting jumpers\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2\u003eEnclosure and outlets\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e1 – Enclosure either pre-cut and drilled or not\u003c\/li\u003e\n\u003cli\u003e1 – L6-30 Flanged outlets for elements\u003c\/li\u003e\n\u003cli\u003e1 – L5-15 Flanged outlets for pumps\u003c\/li\u003e\n\u003cli\u003e1 – L14-30 flanged inlet for main power supply\u003c\/li\u003e\n\u003cli\u003e1 – L5-15 plugs for pumps\u003c\/li\u003e\n\u003cli\u003e1 –L14-30C Connector for main power supply\u003c\/li\u003e\n\u003cli\u003e1 – XLR Male connectors for temperature input\u003c\/li\u003e\n\u003cli\u003eTags for panel include:\n\u003cul\u003e\n\u003cli\u003ePower \/ Off-On\u003c\/li\u003e\n\u003cli\u003eStop\u003c\/li\u003e\n\u003cli\u003eElement \/ Off-On\u003c\/li\u003e\n\u003cli\u003eElement\u003c\/li\u003e\n\u003cli\u003ePump \/ Off-On\u003c\/li\u003e\n\u003cli\u003ePump\u003c\/li\u003e\n\u003cli\u003eTemp Probe\u003c\/li\u003e\n\u003cli\u003e240v \/ 30a\u003c\/li\u003e\n\u003cli\u003e120v \/ 6a\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2\u003eTemperature Controller and probes\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003eElectric Brewing Supply EBS101 PID Controller\u003c\/li\u003e\n\u003cli\u003e1 - 1\/2\" MPT to 1-1\/2\" long Temperature Probe\u003c\/li\u003e\n\u003cli\u003e1 - 1\/2\" NPT Locknuts\u003c\/li\u003e\n\u003cli\u003e1 - 1\/2\" NPT washer and o-rings\u003c\/li\u003e\n\u003cli\u003e1 – XLR Female connectors for temperature probes\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch2\u003eWiring and wire fittings\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003eRange style main power cable\u003c\/li\u003e\n\u003cli\u003eBllack 10 gauge wire\u003c\/li\u003e\n\u003cli\u003eRed 10 gauge wire\u003c\/li\u003e\n\u003cli\u003eGreen 10 gauge wire\u003c\/li\u003e\n\u003cli\u003eBlack 14 gauge wire\u003c\/li\u003e\n\u003cli\u003eRed 14 gauge wire\u003c\/li\u003e\n\u003cli\u003eWhite 14 gauge wire\u003c\/li\u003e\n\u003cli\u003eYellow 14 gauge wire\u003c\/li\u003e\n\u003cli\u003eBlue 14 gauge wire\u003c\/li\u003e\n\u003cli\u003eRed 18 gauge wire\u003c\/li\u003e\n\u003cli\u003eYellow 18 gauge wire\u003c\/li\u003e\n\u003cli\u003eWhite 18 gauge wire\u003c\/li\u003e\n\u003cli\u003e#10 Yellow Spade connectors for 10ga wire connections on SSR relays\u003c\/li\u003e\n\u003cli\u003e#6 Blue Spade Connectors for most 110v wiring throughout the panel\u003c\/li\u003e\n\u003cli\u003e#6 Red spade connectors for the low voltage and temp probe wiring\u003c\/li\u003e\n\u003cli\u003e#10 Blue ring connectors for grounding wire on enclosure posts\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003ch2\u003e Enclosure Information\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003ePre-cut Stainless enclosure is the equivalent of an enclosure straight from our cut stack for the assembled panels, these are cut, cleaned, drilled and tapped.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eAll kits include a printed copy of our wiring guide book.\u003c\/h3\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003ch1\u003eTools you will need include:\u003c\/h1\u003e\n\u003cul\u003e\n\u003cli\u003eWire Cutters\u003c\/li\u003e\n\u003cli\u003eWire strippers\u003c\/li\u003e\n\u003cli\u003eCrimping tools for spade and ring connectors\u003c\/li\u003e\n\u003cli\u003ePhillips screw driver(s)\u003c\/li\u003e\n\u003cli\u003eFlat head screw driver(s)\u003c\/li\u003e\n\u003cli\u003eZip ties and zip tie bases (optional)\u003c\/li\u003e\n\u003cli\u003eLabeler or other means to tag wires\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cul\u003e\u003c\/ul\u003e\n\u003ch3\u003e\u003c\/h3\u003e"}

Complete 30a BIAB Kit

Product Description

Let us help you get started on you endeavor to build an electric brewery. As we build these as well, we have all the parts you need to build your brewery in one location. Give us a few days to assemble and package all the parts you need to build your own BIAB brewery.

Save yourself time and effort, while also reducing the tools needed to build your brewery.

Usual lead time is 1-2 days, as each package is made to order

Let us help you get started.

The kit includes:

Basic Kit Hardware

  • 4 - LEDs (1 white 220v, 1 blue 110v, 1 red 110v, and 1 green 220v)
  • 1 - Emergency Stop locking push button with NC Contact
  • 1 - 2-Way Switches with NO Contact for pump (off-on)
  • 1 - 2-Way Yellow/Orange LED Toggle switch for element contactor (off-on)
  • 1 - Additional NO Contacts for back of 3 way switches
  • 1 - Key toggle Switch for panel on/off
  • 2 - 63a DIN Contactors w/ 110v Coils for main power & element control
  • 1 - 40a Solid State Relays for control of element
  • 1 – Small external pre-drilled and tapped heat sink for element SSR
  • 1 - 1/2m cut of DIN rail or pre-installed piece in pre-cut enclosures
  • Terminal Blocks for wire from 6-24 awg
  • 6a 1 pole DIN Rail Breaker
  • Terminal block anchoring ends
  • Terminal block end covers
  • Terminal block connecting jumpers

Enclosure and outlets

  • 1 – Enclosure either pre-cut and drilled or not
  • 1 – L6-30 Flanged outlets for elements
  • 1 – L5-15 Flanged outlets for pumps
  • 1 – L14-30 flanged inlet for main power supply
  • 1 – L5-15 plugs for pumps
  • 1 –L14-30C Connector for main power supply
  • 1 – XLR Male connectors for temperature input
  • Tags for panel include:
    • Power / Off-On
    • Stop
    • Element / Off-On
    • Element
    • Pump / Off-On
    • Pump
    • Temp Probe
    • 240v / 30a
    • 120v / 6a

Temperature Controller and probes

  • Electric Brewing Supply EBS101 PID Controller
  • 1 - 1/2" MPT to 1-1/2" long Temperature Probe
  • 1 - 1/2" NPT Locknuts
  • 1 - 1/2" NPT washer and o-rings
  • 1 – XLR Female connectors for temperature probes

Wiring and wire fittings

  • Range style main power cable
  • Bllack 10 gauge wire
  • Red 10 gauge wire
  • Green 10 gauge wire
  • Black 14 gauge wire
  • Red 14 gauge wire
  • White 14 gauge wire
  • Yellow 14 gauge wire
  • Blue 14 gauge wire
  • Red 18 gauge wire
  • Yellow 18 gauge wire
  • White 18 gauge wire
  • #10 Yellow Spade connectors for 10ga wire connections on SSR relays
  • #6 Blue Spade Connectors for most 110v wiring throughout the panel
  • #6 Red spade connectors for the low voltage and temp probe wiring
  • #10 Blue ring connectors for grounding wire on enclosure posts

 

 Enclosure Information

  • Pre-cut Stainless enclosure is the equivalent of an enclosure straight from our cut stack for the assembled panels, these are cut, cleaned, drilled and tapped.

All kits include a printed copy of our wiring guide book.

 

Tools you will need include:

  • Wire Cutters
  • Wire strippers
  • Crimping tools for spade and ring connectors
  • Phillips screw driver(s)
  • Flat head screw driver(s)
  • Zip ties and zip tie bases (optional)
  • Labeler or other means to tag wires

    $ 375.00
    Maximum quantity available reached.