$8 flat-rate shipping on $49, Ships FREE over $49.
{ "id":4269420380250, "title":"2x50a PID Control Panel, 4 elements", "handle":"2x50a-pid-control-panel-4-elements", "description":"\u003cp\u003e\u003cstrong\u003eAverage lead is approx 2-4 weeks, during busier seasons this can stretch to 8.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eHit the ground running with one of our complete control panels. Save your time and energy, and let Electric Brewing Supply help you get a jump on your electric brewery.\u003c\/p\u003e\n\u003cp\u003eElectric Brewing Supply does the work so you don't have to. Featuring a fully configured 50a Control panel, ready to be mounted on the wall and plug in.\u003c\/p\u003e\n\u003cp\u003eHave a problem? Wort pumping all over the floor? Forgot a hose? The red mushroom stop button halts all functions, without cutting your brew day short.\u003c\/p\u003e\n\u003cp\u003eEach panel features an interlocking relay, for safety from accidental power up of elements or dry pumping. When the e-stop or key switch are turned on, this relay reacts by either shutting off power to the pumps and elements (therefore appear dead) or it allows power to flow. Additionally, this relay works in conjunction with the e-stop switch, and therefore, protects the hardware even while still leaving you the ability to take corrective action on the still powered PIDs.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSpecifications\u003c\/strong\u003e:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLaser engraved, US manufactured, stainless steel enclosure\u003c\/li\u003e\n\u003cli\u003e50a, 240v electric, single phase (for safety, please use GFCI protection)\u003c\/li\u003e\n\u003cli\u003e50a Twist lock power in supply to 14-50 plug.  6 foot long.\u003c\/li\u003e\n\u003cli\u003eElectric Brewing Supply 200 Series\u003cspan\u003e \u003c\/span\u003ePID Controllers,\u003cspan\u003e \u003c\/span\u003ewith matching \u003cspan\u003e200 Series PID Timer unit\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e4 L6-30 Flanged outlets for 240v Elements up to 5500w or 6000w configured such that both HLT boil Boil elements can come one at the same time.\u003c\/li\u003e\n\u003cli\u003e2 L5-15 Flanged outlets for 120v for pumps such as Chugger or March\u003c\/li\u003e\n\u003cli\u003e3 temperature probe inputs via XLR connection\u003c\/li\u003e\n\u003cli\u003e3 RTD temp probe cables, color coded.\u003c\/li\u003e\n\u003cli\u003e3 RTD 1.5\" long temperature probes with Stainless steel 1\/2\" NPT washer and locknuts for weldless mounting or in plumbing mounting\u003c\/li\u003e\n\u003cli\u003eKey style power switch for secure storage\u003c\/li\u003e\n\u003cli\u003eLocking mushroom button stops all power to elements and pumps\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eWhat will you need aside from the panel to get going:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e5500w or 6000w elements in protective enclosure to attach to kettle\u003c\/li\u003e\n\u003cli\u003e50a GFCI protected, single phase 240v electric service to brew area. Electrician installed highly recommended.\u003c\/li\u003e\n\u003cli\u003e1-2 Pumps, we recommend pairing the L5-15 to 5-15 molded extension cord with your pumps to keep your warranty intact.  They can be found \u003ca href=\"http:\/\/www.ebrewsupply.com\/pump-jumper-6-l5-15p-to-5-15r\/\"\u003ehere\u003c\/a\u003e.\u003c\/li\u003e\n\u003cli\u003eKettles to your liking\u003c\/li\u003e\n\u003cli\u003eOnce you have your panel in place, it is highly recommended that you run auto-tune on your HLT to improve your brewing performance.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eOverall dimensions\u003c\/strong\u003e\u003cspan\u003e \u003c\/span\u003eof control panel measure 20 inches wide, 22 inches tall, and approximately 9 inches deep. \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003ePower requirements for electrics\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eYou will need a NEMA 14-50 outlet on the wall for power.  The outlet should be protected by GFCI breaker for protection.  It is highly recommended for this control you use a 50-60a breaker with proper wiring. We highly recommend you consult and hire a electrician for this task.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e", "published_at":"2019-10-16T09:36:31-04:00", "created_at":"2019-10-16T09:36:31-04:00", "vendor":"Electric Brewing Supply Products", "type":"Electric Brewing", "tags":[], "price":250400, "price_min":250400, "price_max":263000, "available":true, "price_varies":true, "compare_at_price":null, "compare_at_price_min":0, "compare_at_price_max":0, "compare_at_price_varies":false, "variants":[{"id":30765180092506, "title":"NPT Probes", "option1":"NPT Probes", "option2":null, "option3":null, "sku":"asb-pid-1042-nnn", "requires_shipping":true, "taxable":true, "featured_image":null, "available":true, "options":["NPT Probes"], "price":260000, "weight":29484, "compare_at_price":null, "inventory_quantity":0, "inventory_management":null, "inventory_policy":"continue", "barcode":""},{"id":30765217054810, "title":"2 NPT \u0026 1 Tri-Clamp Probe", "option1":"2 NPT \u0026 1 Tri-Clamp Probe", "option2":null, "option3":null, "sku":"asb-pid-1042-nnt", "requires_shipping":true, "taxable":true, "featured_image":null, "available":true, "options":["2 NPT \u0026 1 Tri-Clamp Probe"], "price":261000, "weight":29484, "compare_at_price":null, "inventory_quantity":0, "inventory_management":null, "inventory_policy":"continue", "barcode":""},{"id":30765217087578, "title":"NPT \u0026 2 Tri-Clamp Probe", "option1":"NPT \u0026 2 Tri-Clamp Probe", "option2":null, "option3":null, "sku":"asb-pid-1042-ntt", "requires_shipping":true, "taxable":true, "featured_image":null, "available":true, "options":["NPT \u0026 2 Tri-Clamp Probe"], "price":262000, "weight":29484, "compare_at_price":null, "inventory_quantity":0, "inventory_management":null, "inventory_policy":"continue", "barcode":""},{"id":30765217120346, "title":"3 Tri-Clamp Probes", "option1":"3 Tri-Clamp Probes", "option2":null, "option3":null, "sku":"asb-pid-1042-ttt", "requires_shipping":true, "taxable":true, "featured_image":null, "available":true, "options":["3 Tri-Clamp Probes"], "price":263000, "weight":29484, "compare_at_price":null, "inventory_quantity":0, "inventory_management":null, "inventory_policy":"continue", "barcode":""},{"id":30765217153114, "title":"No Probes", "option1":"No Probes", "option2":null, "option3":null, "sku":"asb-pid-1042", "requires_shipping":true, "taxable":true, "featured_image":null, "available":true, "options":["No Probes"], "price":250400, "weight":29484, "compare_at_price":null, "inventory_quantity":0, "inventory_management":null, "inventory_policy":"continue", "barcode":""}], "images":[], "featured_image":null, "options":["Probe Combination"], "content":"\u003cp\u003e\u003cstrong\u003eAverage lead is approx 2-4 weeks, during busier seasons this can stretch to 8.\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eHit the ground running with one of our complete control panels. Save your time and energy, and let Electric Brewing Supply help you get a jump on your electric brewery.\u003c\/p\u003e\n\u003cp\u003eElectric Brewing Supply does the work so you don't have to. Featuring a fully configured 50a Control panel, ready to be mounted on the wall and plug in.\u003c\/p\u003e\n\u003cp\u003eHave a problem? Wort pumping all over the floor? Forgot a hose? The red mushroom stop button halts all functions, without cutting your brew day short.\u003c\/p\u003e\n\u003cp\u003eEach panel features an interlocking relay, for safety from accidental power up of elements or dry pumping. When the e-stop or key switch are turned on, this relay reacts by either shutting off power to the pumps and elements (therefore appear dead) or it allows power to flow. Additionally, this relay works in conjunction with the e-stop switch, and therefore, protects the hardware even while still leaving you the ability to take corrective action on the still powered PIDs.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eSpecifications\u003c\/strong\u003e:\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003eLaser engraved, US manufactured, stainless steel enclosure\u003c\/li\u003e\n\u003cli\u003e50a, 240v electric, single phase (for safety, please use GFCI protection)\u003c\/li\u003e\n\u003cli\u003e50a Twist lock power in supply to 14-50 plug.  6 foot long.\u003c\/li\u003e\n\u003cli\u003eElectric Brewing Supply 200 Series\u003cspan\u003e \u003c\/span\u003ePID Controllers,\u003cspan\u003e \u003c\/span\u003ewith matching \u003cspan\u003e200 Series PID Timer unit\u003c\/span\u003e\n\u003c\/li\u003e\n\u003cli\u003e4 L6-30 Flanged outlets for 240v Elements up to 5500w or 6000w configured such that both HLT boil Boil elements can come one at the same time.\u003c\/li\u003e\n\u003cli\u003e2 L5-15 Flanged outlets for 120v for pumps such as Chugger or March\u003c\/li\u003e\n\u003cli\u003e3 temperature probe inputs via XLR connection\u003c\/li\u003e\n\u003cli\u003e3 RTD temp probe cables, color coded.\u003c\/li\u003e\n\u003cli\u003e3 RTD 1.5\" long temperature probes with Stainless steel 1\/2\" NPT washer and locknuts for weldless mounting or in plumbing mounting\u003c\/li\u003e\n\u003cli\u003eKey style power switch for secure storage\u003c\/li\u003e\n\u003cli\u003eLocking mushroom button stops all power to elements and pumps\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eWhat will you need aside from the panel to get going:\u003c\/strong\u003e\u003c\/p\u003e\n\u003cul\u003e\n\u003cli\u003e5500w or 6000w elements in protective enclosure to attach to kettle\u003c\/li\u003e\n\u003cli\u003e50a GFCI protected, single phase 240v electric service to brew area. Electrician installed highly recommended.\u003c\/li\u003e\n\u003cli\u003e1-2 Pumps, we recommend pairing the L5-15 to 5-15 molded extension cord with your pumps to keep your warranty intact.  They can be found \u003ca href=\"http:\/\/www.ebrewsupply.com\/pump-jumper-6-l5-15p-to-5-15r\/\"\u003ehere\u003c\/a\u003e.\u003c\/li\u003e\n\u003cli\u003eKettles to your liking\u003c\/li\u003e\n\u003cli\u003eOnce you have your panel in place, it is highly recommended that you run auto-tune on your HLT to improve your brewing performance.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003cp\u003e\u003cstrong\u003eOverall dimensions\u003c\/strong\u003e\u003cspan\u003e \u003c\/span\u003eof control panel measure 20 inches wide, 22 inches tall, and approximately 9 inches deep. \u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003ePower requirements for electrics\u003c\/strong\u003e\u003c\/p\u003e\n\u003cp\u003eYou will need a NEMA 14-50 outlet on the wall for power.  The outlet should be protected by GFCI breaker for protection.  It is highly recommended for this control you use a 50-60a breaker with proper wiring. We highly recommend you consult and hire a electrician for this task.\u003c\/p\u003e\n\u003cp\u003e \u003c\/p\u003e"}

2x50a PID Control Panel, 4 elements

Product Image
Product Description

Average lead is approx 2-4 weeks, during busier seasons this can stretch to 8.

Hit the ground running with one of our complete control panels. Save your time and energy, and let Electric Brewing Supply help you get a jump on your electric brewery.

Electric Brewing Supply does the work so you don't have to. Featuring a fully configured 50a Control panel, ready to be mounted on the wall and plug in.

Have a problem? Wort pumping all over the floor? Forgot a hose? The red mushroom stop button halts all functions, without cutting your brew day short.

Each panel features an interlocking relay, for safety from accidental power up of elements or dry pumping. When the e-stop or key switch are turned on, this relay reacts by either shutting off power to the pumps and elements (therefore appear dead) or it allows power to flow. Additionally, this relay works in conjunction with the e-stop switch, and therefore, protects the hardware even while still leaving you the ability to take corrective action on the still powered PIDs.

Specifications:

  • Laser engraved, US manufactured, stainless steel enclosure
  • 50a, 240v electric, single phase (for safety, please use GFCI protection)
  • 50a Twist lock power in supply to 14-50 plug.  6 foot long.
  • Electric Brewing Supply 200 Series PID Controllers, with matching 200 Series PID Timer unit
  • 4 L6-30 Flanged outlets for 240v Elements up to 5500w or 6000w configured such that both HLT boil Boil elements can come one at the same time.
  • 2 L5-15 Flanged outlets for 120v for pumps such as Chugger or March
  • 3 temperature probe inputs via XLR connection
  • 3 RTD temp probe cables, color coded.
  • 3 RTD 1.5" long temperature probes with Stainless steel 1/2" NPT washer and locknuts for weldless mounting or in plumbing mounting
  • Key style power switch for secure storage
  • Locking mushroom button stops all power to elements and pumps

What will you need aside from the panel to get going:

  • 5500w or 6000w elements in protective enclosure to attach to kettle
  • 50a GFCI protected, single phase 240v electric service to brew area. Electrician installed highly recommended.
  • 1-2 Pumps, we recommend pairing the L5-15 to 5-15 molded extension cord with your pumps to keep your warranty intact.  They can be found here.
  • Kettles to your liking
  • Once you have your panel in place, it is highly recommended that you run auto-tune on your HLT to improve your brewing performance.

Overall dimensions of control panel measure 20 inches wide, 22 inches tall, and approximately 9 inches deep. 

 

Power requirements for electrics

You will need a NEMA 14-50 outlet on the wall for power.  The outlet should be protected by GFCI breaker for protection.  It is highly recommended for this control you use a 50-60a breaker with proper wiring. We highly recommend you consult and hire a electrician for this task.

 

$ 2,600.00
Maximum quantity available reached.

Related products